mail_outline sales@mediastorehouse.com
Raising the Great Bell for Westminster Clock-Tower 1858Officially known as the Great Bell but better known as Big Ben, the huge bell fifteen tons in weight was on its side with not a spare inch either end
Moving the Great Bell 1858Officially known as the Great Bell but better known as Big Ben, entering the arch, being propelled by levers upon a tramway. Date: 1858
TELEPHONE ENGINEERSThree G.P.O. engineers, happy in their work, think nothing of sorting out a mind-boggling mess of telephone wires and cables. Date: early 1930s
M F E BelgrandMARIE FRANCOIS EUGENE BELGRAND French hydrographic engineer responsible for installing the sewage system in Paris. Date: 1810 - 1878
Queen Mary Ocean Liner, being fitted outWith the launching of the Queen Mary Ocean Liner a new phase of work began. Eighteen months between September 1934, and her departure for preliminary trials on 24 March 1936
Installing Fireproof slabs on the roof of Chelsea Town HallInstalling Mack Fireproof slabs on iron purlins on the roof of Chelsea New Town Hall, London. Date: 1907
Installation - Field Telephone System - WW1 - Western Front Date: circa 1916
Engineer installing dock pilingsAn engineer installing dock pilings, to facilitate the loading and unloading of cargo
Workmen put telegraph cables, SyriaWorkmen installing telegraph cables in Aleppo, Syria
Installing an engine for a diesel locomotiveThree railway engineers install a large diesel engine onto the positioned wheel, axle and undercarriage. Photograph by Heinz Zinram
Welding an aluminium roof - Liquid Methane tankA welder seam welds the aluminium roof of a large domed liquid methane tank at Canvey Island. Photograph by Heinz Zinram
Seam welding aluminium plateTwo welders seam weld aluminium metal plates onto the curved framework of a large domed liquid methane tank at Canvey Island. Photograph by Heinz Zinram Date: 1966
Installing a SculptureA new piece of sculpture is added to an Egyptian temple